RoofMeister | Roof Repair & Replacement in Summerville, Goose Creek, SC

Your Charleston Roofing Buyer’s Guide

Buying a roof can be an expensive and stressful process, but it doesn’t have to be. We built this guide to help you understand how it works, so you are confident next time you are ready to repair or replace your roof. 

Table of Contents

Installation & Process

Cost & Payments

Benefits of Choosing Roof Meister

 

Other Common Questions

 

What’s the 11 Step Installation Process at Roof Meister?

1. Tear off existing material

2. Install ice & water shield

3. Install synthetic underlayment

4. Install drip edge

5. Install starter strip shingles

6. Replace roof accessories

7. Install new shingles

8. Install ridge vent

9. Install ridge cap shingles

10. Clean up

11. Final inspection

Check Out Our Installation Process Video!

Get Your Free Roofing Inspection & Consultation!

What’s the Timeline for My Roof Replacement?

A new shingle roof installation will take between 1 day to 2 weeks depending on the size of your project. The duration of most roofing projects are between 1-3 days!

RoofMeister | Roof Repair & Replacement in Summerville, Goose Creek, SC

When Can Linta Roofing Start My Roofing Project?

RoofMeister | Roof Repair & Replacement in Summerville, Goose Creek, SC

How Much Does a Shingle Roof Replacement Cost?

The price ranges below speak to a 3,000 square foot roof (Avg. roof size on the Grand Strand). In general, your roof size 1.5x the square footage of your home or 1.5x the first story of your home (if more than one story). A steep roof will increase this multiple where a shallow roof may decrease it. For example, a 2,000 square foot home normally has a roof that is about 3,000 square foot.  Each package below covers a wide range of factors, which is why you’ll find some overlap in the price ranges.

Will My Project be Supervised?

Superintendent Supervision

Your roofing project will have a dedicated superintendent. They’ll keep you informed with regular updates.

Each week, our superintendents meet with their production manager to review their work and communication quality.

How Much Does a Repair Cost?

When it comes to roof repairs, there is a wide range of prices that you may pay. So, to make things simple, here is some pricing for the most common roof repairs!

RoofMeister | Roof Repair & Replacement in Summerville, Goose Creek, SC

Damaged Shingles

If shingles are missing or damaged there will be a range of pricing depending on how many shingles are damaged. If only a few you could expect to pay around $400.

RoofMeister | Roof Repair & Replacement in Summerville, Goose Creek, SC

Hole Patch

If a tree falls on your roof you may need a hole patched. You can expect to pay around $500. Large holes could cost upwards of $2,000 to patch if damage is excessive. 

RoofMeister | Roof Repair & Replacement in Summerville, Goose Creek, SC

Replace Skylight

RoofMeister | Roof Repair & Replacement in Summerville, Goose Creek, SC

Sagging Roof

If you have a sagging roof you may need wood replaced or rafters repaired. You can expect to pay around $500 to fix a sagging roof. If the area is large or you need rafters fixed you could pay upwards of $3,000.

RoofMeister | Roof Repair & Replacement in Summerville, Goose Creek, SC

Chimney Leak

If your chimney is leaking, there is a good chance that it needs to be re flashed. If you entire chimney needs to be re flashed, depending on the size, you could expect to pay around $1,800. If just a small area needs re flashed it would cost less. If your chimney is large and you have a large amount of rot around your chimney, you could expect to pay upwards of $3,000.

RoofMeister | Roof Repair & Replacement in Summerville, Goose Creek, SC

Flashing Repair

RoofMeister | Roof Repair & Replacement in Summerville, Goose Creek, SC

What are Your Financing Options?

We understand your roofing project is a significant investment, and we’re committed to making it both accessible and affordable. 

Flexible Financing Options:

  • Quick and simple to apply for with no impact on your credit score
  • Various financing options to suit your budget

If you’re considering financing your roofing project, feel free to click below to start an application. You can also discuss financing your roof with your Project Manager if you have additional questions before applying.

Will Insurance Pay for My Roof?

While we can’t guarantee that your insurance will pay for your new roof, we can help you identify insurable damage.  Often we meet homeowners who don’t realize they have insurable damage on their roof.

We will order and provide you with a free storm report so you can know the history of storms that have occurred over your home. If you decide to start a claim we will meet with your insurance adjuster to point out any damage we believe is due to a recent storm.

What’s Excluded from My Estimate?

While we strive to provide a comprehensive and accurate estimate for your roof replacement, there are certain aspects that are not included in the initial estimate. We believe in transparency and want to ensure you are fully informed. Below, we discuss the items that may incur additional costs.

Trimming Out New Skylights

If installing new skylights is a part of your roof replacement, it’s important to note that the cost estimate provided does not include the trimming out of the interior of the skylight. Trimming involves finishing the interior edges around the skylight to ensure a seamless and polished look inside your home. This step may require the expertise of an interior trim specialist or carpenter, which is not covered under our roofing services.

Removing & Re-installing Gutter Covers

If you have gutter covers over your gutters, please be aware that these will need to be detached and reset during the roof replacement process. This service incurs an additional cost beyond the scope of the standard work. The cost for this service can vary depending on the type of gutter cover you have installed. We recommend discussing this with your project manager, who can provide you with an accurate estimate based on your specific gutter cover type.

Flashing Replacement

The cost of your roof replacement does not include the replacement of all flashing on your roof. For most homes, flashing is easily reused and does not require replacement.  Replacing flashing often requires the removal of siding or the installation of counter flashing to properly install new step flashing.  So, if you request new flashing, it will have to be done at an additional cost. 

Electrical Connections for Attic Fans

If we are installing attic fans on your home, it’s important to note that you will need to hire an electrician to make the electrical connections. This ensures that the installation is done correctly and safely. We recommend using a certified electrician for this task to ensure that all electrical work meets the required standards and regulations.

Loading Roof Materials Manually

Our standard practice is to use a boom truck to deliver shingles directly to your roofline. However, if you prefer not to have a boom truck on your driveway, please let us know in advance. In this case, the shingles will be placed on the ground and will need to be carried up to the roof manually, either using a laddervator or by hand. This additional labor will increase the cost of your roof replacement. We want to ensure you are aware of this option so we can provide an accurate cost estimate for the ground drop and manual transport of materials.

Removing Multiple Layers of Shingles

In some cases, there may be multiple layers of shingles on your roof that need to be removed. This is something we may not discover until we begin the tear-off process. While it is unlikely, if we do find additional layers, removing them will incur an additional cost. The cost for removing extra layers of shingles will be clearly outlined in your contract. We want to be transparent about this possibility so you are fully informed about the potential costs associated with your roof replacement.

Damage to Fiber Cement Siding

If your siding touches the roof, it can hold moisture and become more fragile over time, especially with fiber cement siding. During a roof replacement, this can sometimes lead to damage or chipping of the paint when old shingles are removed. If this occurs, repairs would be the homeowner’s responsibility.

Creative Ways to FInance My Roofing Project in Charleston

SC Safe Home or Fortified Grants

SC Safe Home & Fortified Grants are offered to homeowners on an annual basis who would like to hurricane-proof their homes. These grants are limited, meaning you’ll want to stay on top of enrollment dates to receive a grant. Good news, were installers for both programs! So ask your project manager if grants are open. 

Home Equity

Paying for a roof through home equity financing involves using the equity in your home as collateral to secure a loan. You can get a lump sum with a home equity loan, a flexible line of credit with a HELOC, or a cash-out refinance that replaces your existing mortgage. These options generally offer lower interest rates and longer repayment terms, making them suitable for large expenses like a new roof.

Referral Program

We offer a referral program. For every homeowner that has a roof replacement by your referral, we will pay you $200.

Veteran Discount

If you’re a veteran living on the Grand Strand, we proudly offer a special discount as a token of our appreciation for your service. Through our manufacturer you will receive a $250 rebate on your roofing project with us!

Contractor Financing

Contractor financing allows homeowners to finance home improvement projects directly through Linta Roofing. We partner with a financing company to offer loan options, making it easier for homeowners to afford large projects by spreading the cost over time with manageable payments.

RoofMeister | Roof Repair & Replacement in Summerville, Goose Creek, SC

When Do I Pay for My Roofing Project?

We will collect 50% of your project cost when you sign a proposal with us. Once your project is completed, we will collect the remaining 50%.

How Will I Benefit from Roof Meister’s Unique Process

We don’t call it the Elevated Roofing Experience for nothing. At every stage of your roofing project, we keep you informed and supported, ensuring you understand the process and feel confident in your decisions. Our commitment to transparent communication and expert guidance means you’ll make choices for your roof that you can be proud of for years to come.

Our Qualifications

Roof Meister has proudly served Horry, Brunswick, Georgetown and Columbus county since 1985. Along the way we have learned a lot and we are thankful you have recognized us for some of the qualifications below:

900+ 5-Star Google Reviews

Roofing Company of the Year 2025

A+ BBB Rating

40+ Year Family Business

Fully Licensed & Insured

GAF Master Elite Contractor

GAF Master Commercial Roofing Contractor

SC Safe Home Certified Contractor

Fortified Roofing Contractor

Sun News “Best of the Beach” Multi-year winner

RoofMeister | Roof Repair & Replacement in Summerville, Goose Creek, SC

A Letter From Our President

My father, Jeff Linta, learned everything he knew about roofing and construction from my grandfather John Linta. He continued his fathers legacy with Jeff Linta Roofing & Construction in the hope that contractors could be trusted again. As I got older, my father put me to work & taught me everything there is to know about roofing. When he passed in 2022, I became the President of his company and reframed the focus around what I know best; roofing. 

Linta Roofing was built on 3 generations of roofers, with a 39+ year reputation in the Myrtle Beach area. & we’re still in the business of trust to this day, providing our local community with an Elevated Roofing Experience.

 

-Jeffrey Linta II

How Can I Have the Most Effective Roof Inspection with Linta Roofing?

RoofMeister | Roof Repair & Replacement in Summerville, Goose Creek, SC